Get A Free Quote

*Note: Please fill in the information accurately and keep the communication open. We will contact you as soon as possible.

Submit

Project Cases

Ningbo Hangzhou Bay New District Aviation AvenueMunicipal Project


Year of Construction: 2021 Application Field: Municipal Road and Sewage Pipeline Construction Product Specification: Pipe Jacking DN1000/SN80000/PN1/2650KN Pipe Jacking DN1200/SN60000/PN1/3380KN Total length of pipeline : 5200m Construction Method: Pipe Jacking

The Tonghang Avenue (Xingci 7th Road – Xingci 4th Road) municipal project in the Ningbo Hangzhou Bay New Area extends from Xingci 7th Road in the west to Xingci 4th Road in the east. The road has a total designed length of 5,282.75 meters and a planned width of 44 meters. Designed to urban arterial road standards with a design speed of 60 km/h, the project includes the construction of three new bridges and one new sewage pumping station along the route. The entire sewer pipeline system utilizes centrifugally cast fiberglass-reinforced plastic (GRP) pipes for pipe jacking. The total length of the jacking section exceeds 5,200 meters, comprising over 3,000 meters of DN1200 pipes and over 2,000 meters DN1000 of pipes.